State Key Laboratory of Photovoltaic Materials and Technology
 
 
Time: 2010
Location: Baoding, Hebei
Capacity: 1.4MW
Installed area:11618㎡
Project Characteristics: 
Using silver-gray coated glass, the whole building is covered with BIPV. It is the first national key laboratory in China's photovoltaic industry that has passed the acceptance of the Ministry of Science and Technology, covering the whole industrial chain of solar, representing the highest level of photovoltaic research in China. In the standard can fully meet the local Baoding 50% building energy saving standards and has been recognized by the country and the industry, on behalf of the domestic BIPV project towards the practical.
Copyright © 2021 GAIN SOLAR All Rights Reserved